Shared Learnings

StayLive actively promotes the sharing of information as soon as possible after near miss or actual safety incidents to inform members about hazards arising out of their operations.

9 December 2025

During planned outages at our hydro power stations, several dewatering and rewatering operations are scheduled. 

Read more...

28 November 2025

A metering technician visited a commercial and industrial customer's premises to test and certify a CAT4 meter following site energisation.

Read more...

6 October 2025

The use of a hook on a forklift as a crane.

Read more...

6 October 2025

Timberlands running block fell approximately 36 metres from teh Earth Peak crossarm to ground level.

Read more...

24 September 2025

Wind Farm sites can experience extremes in weather, quickly changing environmental conditions and steep and challenging topography.

Read more...

19 September 2025

A tank underwent internal inspection and minor repairs, requiring material removal and disposal in a re-purposed ISO Container.

Read more...

23 July 2025

A worker was electrical testing the workshop appliances. When plugging in a large grinder to test it, the grinder instantly started up and took off.

Read more...

11 July 2025

A new screen cleaner and intake screens were being installed at the intake forebay on the canal. 

Read more...

17 June 2025

From 9th June 2025, BOC are introducing an increased pressure and capacity MP15 Nitrogen Cylinder (152MP15) in the North Island which will replace the existing G15 cylinders (152G15).

Read more...

17 June 2025

During the commissioning of G2 11kV switchgear cubicle and circuit breaker, three tagged earthing leads were inadvertently left connected to the G2 11kV terminations on the Local Services Transformer.

Read more...