StayLive actively promotes the sharing of information as soon as possible after near miss or actual safety incidents to inform members about hazards arising out of their operations.
20 February 2019
In February 2019, on one particular occasion during confined space work on Unit 1 at Huntly Power Station, our protocols put in place to keep us all safe at work were not adhered to.
15 February 2019
Air pressure regulator bowl failed under pressure blowing out, sending debris flying and system to depressurise.
11 February 2019
Two separate incidents have occurred in our office where Evantair oscillating fan blades have shattered / exploded when turned on.
7 February 2019
A Boiler Furnace Work Party had Fly Ash lumps fall on them when the ash was disturbed by an adjacent work party.
13 December 2018
A propane gas torch was being used for heating when the hose failure (split) releasing propane gas into the area. This gas ignited and singed the beard of the contractor.
13 December 2018
To prevent airflow, dust and debris from affecting maintenance work on the high-pressure control valve (HPCV), pneumatic plugs were inserted into the pipes.
1 November 2018
A work party of 3 were tasked with completing a generator bearing replacement as part of planned maintenance work at the Te Apiti remedial project.
19 September 2018
During clean up of an abandoned wellhead a bull plug fell off due to indirect shock loading from hammering on the Casing Head Flange.
14 September 2018
Whilst removing hot food from a microwave that was placed on top of a fridge the dish tipped and resulted in burns to the persons face.
5 September 2018
When grinding, the grinder caught the back of a woven backed glove resulting in cut to hand.